Stenhoj Ds2 Manual May 2026
Check the vehicle's stability before raising it fully. Full Lift: Raise the vehicle to the desired working height. Lowering a Vehicle
Screw the rubber pads up to touch the chassis. Initial Lift: Raise the vehicle slightly off the ground. stenhoj ds2 manual
Ensure no tools or people are under the lift. Press Lower: Hold the down button on the control panel. Check the vehicle's stability before raising it fully
3-phase 400V (standard) or 1-phase 230V (optional). Overall Width: Varies by installation setup. Pre-Installation Requirements stenhoj ds2 manual
Check for debris blocking one of the carriage rollers. Excessive Noise
Ensure at least 4 meters of overhead clearance. Bay Width: Leave 1 meter of space around the lift posts.