Riggers must remain 100% tied off to approved anchor points.
Marshals must guide transport trucks into and out of the site to prevent collisions. 7. Emergency Response In the event of an accident or equipment failure: Cease all lifting operations immediately. Secure the load if possible. Follow the site-specific Emergency Action Plan (EAP).
Ensures all components are balanced and secured before disconnecting.
A physical barrier at ground level to prevent unauthorized entry into the "drop zone."
The assist crane supports the counter-jib while pins are removed. The tower head (apex) is disconnected and lowered. Phase 5: Mast Section Removal
Method Statement: Tower Crane Dismantling The dismantling of a tower crane is one of the most high-risk phases of a construction project. Unlike installation, where the site is often clear, dismantling usually occurs when the building is nearly finished, leaving limited space and tighter logistics.
If the assist crane has enough height, it simply unbolts and lifts each mast section directly from the top.
The crane is rotated to the pre-agreed "parked" position to allow the assist crane access.